CLIENT: Belfast Telegraph Limited
DURATION: 12 WEEKS
COMPLETION DATE: September 2016
CONSULTANT: Simpson & Crawford Consulting Ltd.
DESCRIPTION OF WORKS: We were intrusted with the Electrical Installation to both the Land Lords and Tenant fit
out contracts. The complete project had to be completed in 12 weeks including commissioning and along with the
assistance of the Main Contractor and other Sub Contractors this was achieved.
The project had many systems installed and with the building being partially occupied there were many obstacles that
we were able to overcome and complete.
The Electrical services involved the following systems:
- Mains & Sub Power Distribution
- Generator Changeover Panel
- UPS System
- General & Emergency Lighting
- External Lighting Installation
- General Purpose Power
- Fire Alarm Installation
- Intruder Alarm/CCTV Installation
- Disabled Toilet Alarm System
- Deaf Loop System
- Data Cabling Installation
- Mechanical Services Wiring
- TV Installation
- Door Access System Installation
- Disabled Refuge Installation
- Air Conditioning System
ACCREDITATIONS